Skip to content
OAC18 Properties logo
Dubai Islands — Emerging waterfront, off-plan led

Render — not a photograph

Community · Emerging · Masterplan by Nakheel

Under construction

Dubai Islands

Five islands off Deira, twenty kilometres of coastline, and most of it still a plan.

Stage
Under construction
Developer
Nakheel
Types
ApartmentsBeachfront villasPlots
From
AED 1.91M
Handover
Q4 2026 – 2029
Drive times
DXB airport — 15 minDeira — 10 minDowntown Dubai — 25 min
What it is

The next coast, sold before it is built.

Dubai Islands is Nakheel's relaunch of the former Deira Islands: five islands linked by bridges to Deira, with beaches, a golf course, marinas and a large hotel allocation in the master plan. Bridges and the first beachfront buildings are complete; most of the residential stock is off-plan.

Master developer
Nakheel
Completion
Phased through the 2030s; Nakheel has not published an end date

You are buying a beach and a timeline. Check who is delivering both.

What exists today

What is physically there in Dubai Islands.

The road bridges from Deira are open and the Blue Flag beach is in use. Two or three resort hotels and Souk Al Marfa trade; that is the extent of what operates today.

The first residential buildings are handing over or close to it, but as of our last visit the islands had few permanent residents. Most residential stock is under construction or unlaunched land.

No school, no clinic and almost no everyday retail on the islands; Deira's shops and Dubai Hospital are ten minutes across the bridge.

The marinas, the golf course and the mall in the master plan are not built and have no firm dates that we would rely on.

Last verified

  1. Handed over · 2020–2023

    Bridges, beaches and the first hotels

    The road bridges to Deira, the Blue Flag beach, Souk Al Marfa and the first resort hotels on Island A.

  2. Under construction · 2025–2027 (developer targets)

    First residential buildings

    Low- and mid-rise beachfront apartments from Nakheel and third-party developers; the earliest are handing over.

  3. Planned · 2028 onward (no firm dates)

    Marinas, golf course and later residential islands

    The bulk of the master plan: two marinas, an 18-hole course, further hotels and most of the housing.

Off-plan investors
Beachfront entry prices well below the Palm and Emaar Beachfront.
Buyers with time
Five-year horizon at least; the district's amenities arrive after the homes.
Less suited to
Anyone who needs to live there soon, or who wants a developer with a long record on the plot.

Planned — not built

Nothing in this list exists yet. Dates are the developer's own where any have been published — treat them as intent, not as a move-in plan.

  • Dubai Islands marinasPlanned · No date published
  • 18-hole golf coursePlanned · No date published
  • Dubai Islands Mall (Nakheel)Planned · No date published

  • DXB airport15 min
  • Deira10 min
  • Downtown Dubai25 min
  • Dubai Marina45 min

Bridges to Deira; DXB airport in fifteen minutes. The rest of the city is on the far side of the creek.

Fifteen minutes to the airport, forty-five to the Marina. This is a north-of-the-creek address, and that suits some buyers and not others.

Existing — built and open

  • Road bridges to DeiraBridge
  • Blue Flag public beachBeach
  • Souk Al MarfaRetail
  • Resort hotels on Island AHotel

Planned — not built

Target dates are the developer's or the authority's, and several have moved before. Treat them as upside, not as a commute plan.

  • Further bridge and road linksPlanned · Phased; no dates we would rely on

Schools — operating

  • No school on the islands; Deira and Mirdif schools are within twenty minutes.

Healthcare — operating

  • None on the islands; Dubai Hospital in Deira is about ten minutes.

Planned — not open

A site on a masterplan is not a school. Nothing below has an operator or an opening date we would plan a move around.

  • School sites appear in the master plan; no operator or opening date has been announced.Planned · date TBC

Projects in this community

When the supply lands.

11 projects we cover in Dubai Islands, grouped by the year they are due to hand over — so you can see where completions cluster before you pick one.

2026

Handover 2026 · 1 project
  • Render of Mackerel Tower on Dubai Islands, a white terraced building with planted balconies above a patterned podium, palms along the road in frontUnder constructionTarrad Development
    Dubai Islands

    Mackerel Tower

    Price on application

    Handover
    Q4 2026

    Apartments

2027

Handover 2027 · 3 projects
  • Render of the facade of Villa dell'Arte on Dubai Islands at dusk, fluted columns and cantilevered terraces with plunge pools above a garden of striped loungers, a lighthouse and the sea beyondNew launchMr. Eight Development
    Dubai Islands

    Villa dell'Arte

    From AED 1.91M

    Handover
    Q3 2027
    Payment plan
    40/60

    1 bed – 4 bed · Apartments

  • Render of LIV Oceanside on Dubai Islands from the air, a terraced tower on a curved podium beside a marina of moored yachts, with the open sea beyondUnder constructionLIV Developers
    Dubai Islands

    LIV Oceanside

    Price on application

    Handover
    Q4 2027

    Apartments & penthouses

  • Render of Villa del Gavi on Dubai Islands at dusk seen from the sea, a lit terraced building on a fluted podium behind palms and a beach of loungersNew launchMr. Eight Development
    Dubai Islands

    Villa del Gavi

    From AED 3.66M

    Handover
    Q4 2027
    Payment plan
    35/65

    2 bed – 4 bed · Apartments

2028

Handover 2028 · 2 projects
  • Render of Sea Cliff by Imtiaz on Dubai Islands, the stone-framed residential block with pergola-topped terraces beside a palm-lined road, with the Dubai skyline in the distanceUnder constructionImtiaz Developments
    Dubai Islands

    Sea Cliff by Imtiaz

    Price on application

    Handover
    Q1 2028

    1 bed – 4 bed · Apartments

  • Render of FLU1D ONE by Object 1 on Dubai Islands, the residential block above a curved bronze-screened podium beside a palm-lined road with the sea beyondUnder constructionObject 1
    Dubai Islands

    FLU1D ONE

    From AED 2.05M

    Handover
    Q2 2028
    Payment plan
    20/30

    1 bed – 2 bed · Apartments

2029

Handover 2029 · 1 project
  • Render of HADO by Beyond at Dubai Islands, terraced towers with planted balconies around an oval podium poolNew launchBeyond Developments
    Dubai Islands

    HADO by Beyond

    Price on application

    Handover
    2029

    1 bed – 4 bed · Apartments

Handover to be confirmed

4 projects

Next step

Availability in Dubai Islands comes from a person.

Most of Dubai Islands is still a plan, so what is genuinely open to buy is a short list that changes launch by launch. Tell us the budget and the handover year you can live with and we will send what is open now, at today's prices, with the phases we would avoid.

Use Availability in the bar below — an advisor checks it before sending and replies within one business day.

Book a consultation

OAC18 Perspective

Buy Dubai Islands for beachfront at a fair entry price. Buy the developer, not the master plan.

Raza Mujtaba, Co-Founder & Head of Advisory

Raza Mujtaba

Co-Founder & Head of Advisory · Client advisory & team development

Book with Raza
Where it is strong
Beachfront pricing sits well below the Palm and Emaar Beachfront, the bridges and beaches are real, and Nakheel controls the master plan.
Where it falls short
Most stock is off-plan from third-party developers with short records. Amenities arrive after the homes. It is on the far side of the creek from most of the city's jobs.
Supply and handover

The supply pipeline is large and comes from dozens of third-party developers on Nakheel plots, many with short delivery records. Handover clustering is likely from 2026 to 2028 as the first wave completes together, and there is no rental history yet to say what those units will let for. We treat quoted yields here as projections, not evidence.

We shortlist here only from developers whose handover history we can show you. For buyers with a five-year horizon who want beachfront and accept a wait, it is worth considering; for anyone who needs the neighbourhood now, it is not.

Compare with nearby communities

Where else the same money goes.

  • Emaar Beachfront — New towers, private beach, between the Marina and the Palm
    First phases handed over

    Emaar Beachfront

    Finished beach towers between the Marina and the Palm, at roughly a third more per square foot.

  • Dubai Creek Harbour — Emerging waterfront district
    First phases handed over

    Dubai Creek Harbour

    The other emerging waterfront, with one master developer building it and a promenade already trading.

  • Palm Jumeirah — Waterfront villas and branded residences
    Established

    Palm Jumeirah

    The established beach address the islands are priced against; twice the price, none of the wait.

Raza Mujtaba, Co-Founder & Head of Advisory
Raza MujtabaCo-Founder & Head of Advisory

Ask what we would avoid in Dubai Islands.

Twenty minutes on Dubai Islands specifically — which phases, which developers, and where the handover and resale risk actually sits.

Cookie preferences

Necessary cookies keep the site working. The other two are your call, and you can change your mind here or from the cookie policy at any time.