Skip to content
OAC18 Properties logo
Sobha Hartland II — Sobha's second Hartland master community at Bu Kadra

Render — not a photograph

Community · Emerging · Masterplan by Sobha Realty

Under construction

Sobha Hartland II

Eight million square feet of towers going up beside Ras Al Khor. Nothing has handed over.

Stage
Under construction
Developer
Sobha Realty
Types
ApartmentsVillas
From
AED 1.83M
Handover
Q2 2030
What it is

One developer, one site, no residents.

Sobha Hartland II is Sobha Realty's second master community in Mohammed Bin Rashid City, at Bu Kadra, immediately east of the original Sobha Hartland and close to the Ras Al Khor Wildlife Sanctuary. Sobha describes it as roughly eight million square feet with more than a million square feet of green space.

Master developer
Sobha Realty

A single developer is a quality argument and a concentration risk at the same time. Here you are taking both.

What exists today

What is physically there in Sobha Hartland II.

No residential building in Sobha Hartland II has been handed over, and there are no residents.

Construction is running across roughly a dozen towers, including the Riverside Crescent buildings and the Skyscape and Skyvue clusters. Further buildings are at planning stage.

There is no retail, school, clinic or park open inside the community. Hartland International School and North London Collegiate School Dubai are about two to three kilometres away, in and beside the original Sobha Hartland.

No metro station serves the community.

Last verified

Off-plan buyers who want a consistent specification and a central location, and can wait for it.
Buyers already familiar with Sobha Hartland who want the same build at an earlier price.
Less suited to
anyone who needs to move in soon, anyone who wants a second developer's price to compare against, and anyone selling at handover.

Planned — not built

Nothing in this list exists yet. Dates are the developer's own where any have been published — treat them as intent, not as a move-in plan.

  • Sobha's published green spaces, retail and community amenitiesPlanned · Phased with the towers; Sobha publishes no completion date we would rely on

The community sits between the original Sobha Hartland and Ras Al Khor, which puts Downtown, Business Bay and Dubai International Airport within a short drive.

No metro station serves the community.

Projects in this community

When the supply lands.

1 project we cover in Sobha Hartland II, grouped by the year they are due to hand over — so you can see where completions cluster before you pick one.

2030

Handover 2030 · 1 project

Next step

Availability in Sobha Hartland II comes from a person.

Most of Sobha Hartland II is still a plan, so what is genuinely open to buy is a short list that changes launch by launch. Tell us the budget and the handover year you can live with and we will send what is open now, at today's prices, with the phases we would avoid.

Use Availability in the bar below — an advisor checks it before sending and replies within one business day.

Book a consultation

OAC18 Perspective

Central, single-developer and entirely unbuilt. Buy the build quality, and price the wait.

Raza Mujtaba, Co-Founder & Head of Advisory

Raza Mujtaba

Co-Founder & Head of Advisory · Client advisory & team development

Book with Raza
Where it is strong
A central Mohammed Bin Rashid City location beside Ras Al Khor, one developer controlling design and construction, and an established sister community next door to judge the standard by.
Where it falls short
Nothing has handed over and nobody lives here, there is no retail, school or clinic inside the community, no metro, and around a dozen towers by one developer will complete into the same window.
Supply and handover

A dozen towers by one developer on one site will complete within a narrow window. Anyone buying to resell at handover should assume they will be selling alongside a large number of near-identical units and against Sobha's own next release.

We would look at it for a buyer who wants the Sobha specification in a central location and is holding for the long term. We would not recommend it to anyone whose plan is to assign or resell on completion, and we would not sign anything until Sobha has put the payment schedule and the anticipated completion date in writing.

Compare with nearby communities

Where else the same money goes.

  • Dubai Creek Harbour — Emerging waterfront district
    First phases handed over

    Dubai Creek Harbour

    The same bet on the Ras Al Khor side of the city — larger, older, and with the first phases already lived in.

  • Business Bay — Canal-side towers, rental-led, next to Downtown
    Established

    Business Bay

    If you want the same commute today rather than at the end of the decade, in a district that is already finished.

  • Downtown Dubai — Urban, rental-led
    Established

    Downtown Dubai

    Finished, central, walkable; priced for the address

Raza Mujtaba, Co-Founder & Head of Advisory
Raza MujtabaCo-Founder & Head of Advisory

Ask what we would avoid in Sobha Hartland II.

Twenty minutes on Sobha Hartland II specifically — which phases, which developers, and where the handover and resale risk actually sits.

Cookie preferences

Necessary cookies keep the site working. The other two are your call, and you can change your mind here or from the cookie policy at any time.